General factory installations......

Our skills...

General factory installations-Piping & Boiler Making

Piping & Boiler Making...

  • Small diameter laboratory piping.
  • Large diameter boiler making piping for all fluids (steam, hot line calculations).
  • Boiler making for: laboratories, boiler rooms, quarries and, industry in general.
General factory installations-Piping & Boiler Making General factory installations-Piping & Boiler Making

Work undertaken...

  • Reorganisation of a laboratory. Research into the distribution of fluids in fume chambers, work pans and hoods.
  • Installation of a CF5 GS turbine and alternator, G52S5-46M3. Research and calculations booklet (thermo-mechanical analysis):
    • - 40-bar steam piping
    • - 6-bar steam piping
    • - 6-bar drain tank
  • Installation of a multi-tubular cooler. 
  • Research into setting up a heating oil tank with calculations of the piping section for overflow using the available surfaces method.
  • Research and project management of biological reservoir aerators.
  • Research and project management of cooling for wastewater treatment plant biological reservoirs.
  • Research and project management for changing an oven section (1,920mm in diameter – 13m in length).
  • Major boiler making projects: large capacity hoppers for quarries.